Henan Oilfield Branch Sinopec Nanyang Energy Chemical Co., Ltd. 2018 Static Equipment and Pipeline Maintenance and Maintenance Project
General Contracting Tender Notice
1. Tender conditions
Henan Oilfield Branch Sinopec Nanyang Energy Chemicals Co., Ltd. The static equipment and pipeline maintenance and transportation project in 2018 has been approved by the company for implementation of the implementation plan. The project owner is Sinopec Nanyang Energy Chemicals Co., Ltd. The construction fund comes from the unit cost and the investment ratio is 100. %. The tenderer is China Petroleum & Chemical Corporation Henan Oilfield Branch. The project has already met the conditions for tendering and is now conducting an open tender. Invited potential bidders are invited to participate in the tender.
2. Project Overview and Bidding Scope
2.1 Bidding Project Name: Henan Oilfield Subsidiary Sinopec Nanyang Energy Chemicals Co., Ltd. 2018 static equipment and pipeline maintenance and transportation project;
2.2 Construction Site: Sinopec Nanyang Energy Chemical Co., Ltd.;
2.3 Construction Scale: The production and production of ancillary equipment for the production and production of Sinopec Nanyang Energy Chemicals Co., Ltd. during the start-up period of various types of stationary equipment, facilities, and industrial pipelines for maintenance and repairs, as well as the company’s monthly planned inspection and maintenance projects of 100,000 yuan or less, and non-investment Type of technical project;
2.4 Construction Investment: The project amount is controlled at 3.6 million yuan (excluding tax);
2.5 Plan duration: From January 1, 2018 to December 31, 2018, the construction period of each individual sub-contract shall meet the requirements of the owner;
2.6 Division of tenders: This project does not divide bids, only one successful bidder is identified;
2.7 tender range of tenders:
1.1 Inspection and maintenance of towers, cold exchange, containers, storage tanks, heating furnaces, reactors, and other small equipment, as well as supporting anti-corrosion, thermal insulation, and civil construction.
1.2. The pressure pipelines disappeared, some of them were replaced, and the related anti-corrosion, thermal insulation and civil engineering contents were included.
1.3. Local reinforcement, replacement, supporting anti-corrosion, thermal insulation, and civil construction of ladders, platforms, railings, steel gratings, etc.
1.4. Disassembly and installation of safety valves, valves, etc.
1.5, replacement of the entire cold exchange equipment and core replacement, core pressure test plugging, flanges and pipe boxes, such as leakage fastening, thermal tightness and supporting corrosion, insulation, civil engineering content.
1.6, the device starts the operation and transportation, equipment heat tight and so on.
1.7. Lifting and cooperation work.
1.8, electrical, instrument repair work.
1.9. Other maintenance and welding projects arranged by the company.
1.10. Demolition and restoration of pressure vessel and piping inspection grinding and insulation.
1.11 Monthly plan maintenance inspection items and non-investment technical measures (including static equipment, pipelines, electrical and instrumentation maintenance items and supporting anti-corrosion and thermal insulation civil engineering content) with an amount of less than 100,000 yuan.
2.8 Quality Standards: Qualified, in line with relevant national regulations and quality requirements for "Petrochemical Equipment Maintenance and Inspection Regulations";
3. Bidder qualification requirements
3.1 The bidder should have the following basic qualifications:
(1) An independent legal person registered in the territory of the People's Republic of China;
(2) Hold the corresponding qualification certificate issued by the administrative competent department: (1) The competent administrative department of construction shall issue a construction qualification certificate for the general contracting of the construction of petrochemical engineering and above; (2) The General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China shall issue an effective special special of the People's Republic of China. Equipment installation, renovation and maintenance permit (pressure vessel, pressure pipeline) qualification certificate; 3 valid safety production license issued by the construction administrative department;
(3) Hold an effective quality management, environmental management, occupational health and safety management system certification;
(4) In the past three years, there have been construction performances of similar equipment for the maintenance of static equipment and pipelines, and transportation, and the calculation of similar projects for the past three years was completed on January 1, 2015;
(5) The company is in good financial condition, has sufficient assets and capabilities and effectively performs the contract;
3.2 The Commonwealth does not accept bids from the Consortium.
3.3 The tender requires the bidder to propose that the following personnel must be registered employees of the company (subject to the current social security issued by the social security department). During the contract implementation period of this project, no other part-time job is allowed. The qualification requirements for the personnel are as follows:
(1) The project manager shall possess the qualification of registered construction engineer who is professional in mechanical and electrical engineering (grade) level and above; he shall hold “B†type certificate of the three types of personnel for effective safety production. In the past 3 years, there have been static equipment and pipeline maintenance and transportation. Construction performance;
(2) The person in charge of safety possesses the "C" certificate of the registered safety engineer qualification certificate or an effective safety production class III personnel;
(3) The person in charge of technology holds a certificate in junior and senior technical titles for electromechanical or related majors. In the past three years, he has had static equipment and pipeline repairs and maintenance and transportation performance.
3.4 This tender qualification review method: After qualification review.
4. Bidding documents and related data acquisition
4.1 If you are interested in bidding, please purchase the tender documents according to the following time and place:
(1) Purchase time: From December 13, 2017 to December 19, 2017, daily from 8:00 to 11:30 and from 2:30 to 5:30;
Personal Protective Equipment
With more than 15+ yrs rich MFG experience, you can definitely trust in and cooperate with.
Provide you with the supply of personal protective equipment. to help you safely get back to your daily routine.
Our products include pulse Oximeter Finger, Forehead Thermometer, Automatic foam soap dispenser, etc.
Our strict quality control protocol thoroughly vets every aspect of production, storage, and shipments all the way way to our end customers.
protective equipment, ppe personal protective equipment, definition of personal protective equipment
TOPNOTCH INTERNATIONAL GROUP LIMITED , https://www.micbluetooth.com