Artificial climate box use method - Database & Sql Blog Articles

Probe domestic switch needle KG-300K needle head diameter is 3.0mm normally open switch needle
MOS power IC full range
Photocoupler
How to use artificial climate chamber Shanghai Chenxun Instrument Technology Co., Ltd. specializes in producing chromatography freezer, freeze dryer, chiller, ultra-low temperature refrigerator, constant temperature tank, biochemical incubator, mold incubator, constant temperature and humidity chamber, light incubator, Artificial climate chamber, carbon dioxide incubator, multifunctional carbon dioxide incubator, electric thermostatic incubator, water-blocking constant temperature incubator, blast drying oven, vertical blast drying oven, high temperature blast drying oven, vacuum drying oven, hot air Sterilization box, dry culture dual-use box, electric thermostatic water tank, electric thermostatic water bath, low temperature thermostat, constant temperature heating plate, integrated muffle furnace, shaker, etc. and other laboratory equipment, first-class professional, first-class Service, Shanghai Chen Xun is your best choice! Our company has a professional technical team, with strong research strength, to ensure the quality of equipment, so that the majority of users can rest assured. The following small series briefly introduces the analysis and handling of common faults in artificial climate chambers and precautions. Welcome everyone to come and consult.
Immediately after turning on the power, turn on the fan switch (the “lighting” button) to prevent the heating part from being heated in the absence of wind circulation (when the memory temperature value is lower than the ambient temperature value, it is safe, such as the memory temperature value is greater than the studio At the internal temperature, the heating part will work immediately after starting up, so it is necessary to first open the fan to make the wind cycle, so that the overall temperature can be evenly controlled by the thermostat, avoiding the possibility of burning parts at local high temperature, so it is recommended that you In the case of power on, the fan switch must be turned on first, and it is necessary to confirm that the fan has been working normally. Then set other parameters.

Battery Management System

Shenzhen Sunbeam New Energy Co., Ltd , https://www.sunbeambattery.com